When several suppliers quote the same BOM and the totals are far apart, the cause is rarely that one of them is simply cheaper. More often each has quoted something slightly different: a different part, a different pack, stock for some lines and factory lead time for others, freight in or out. A good request for quotation stops that before it happens. It defines exactly what to quote, how to report any departure, and what evidence will decide the award.
This guide walks through building the pack. Comparing the answers once they arrive is the subject of the quote comparison guide.
Start with a one-page cover sheet
Put the rules of the event on one page, at the front:
- RFQ number, owner, issue date and revision;
- product or project name and stage: prototype, pilot or production;
- what is being quoted: components only, a kitted BOM, PCB assembly, programming, test, logistics, or a combination;
- the deadline for questions, the deadline for quotations, and how long quotes must stay valid;
- currency, ship-to address and the expected award date;
- confidentiality terms and how files may be shared;
- one contact for technical questions and one for commercial ones.
If programming, tooling or inspection is optional, ask for it as a separate price. Otherwise it disappears into the material cost and you cannot compare it.
Send a BOM that cannot be misread
Issue a dated, revision-controlled BOM, not a file called "BOM final v3 latest". Name the drawing, firmware and approved-manufacturer list revisions that go with it. IPC's Product Data eXchange standards (IPC-2570 series) keep the bill of materials, approved manufacturer list and approved supplier list as distinct data for good reason: what the product is, where it may come from and what a supplier is offering are different things, and they should be different columns in your sheet too.
Give every row a line ID that never changes, so responses map back without guesswork. A practical component table:
| Field | Why it is there |
|---|---|
| Line ID and internal part number | Keeps responses tied to the right row across revisions |
| Manufacturer and exact MPN | Stops suppliers quoting from a description |
| Description and value | A human cross-check on the MPN |
| Package and mounting | Prevents fit and assembly errors |
| Quantity per assembly | Drives the extended demand |
| Approved alternates | Shows which choices are already approved |
| Grade and compliance notes | Automotive, temperature range, RoHS and similar |
| Reference designators | Helps an assembler review the build |
| Criticality or lifecycle flag | Points effort at the risky lines |
Be careful when merging duplicate lines. Two capacitors with the same value and case size can differ in voltage rating, dielectric, tolerance or qualification, and are not interchangeable just because the description matches. If you have not yet reviewed the BOM for supply risk, the BOM risk guide is a useful step before the RFQ goes out.
Give demand by build phase
A single annual figure hides the questions that matter. State quantities and dates for engineering samples, the pilot, launch and steady production, and say clearly which numbers are firm and which are forecast.
Then ask for these fields on every line:
- sample availability and its source;
- quoted quantity and price breaks;
- MOQ, standard pack and order multiple;
- stock on hand and where it is;
- factory lead time and what it is measured from;
- options for scheduled releases;
- non-cancellable, non-returnable status;
- quote validity.
Those fields expose trade-offs the unit price hides. An illustrative case: one bid at ₹5.00 a piece needs a 50,000-piece order, while another at ₹5.40 will supply a 2,000-piece launch. The MOQ, lead-time and date-code guide shows how to turn such differences into excess stock and cash.
Say which sources are acceptable
For each risk tier, state the routes you will accept: manufacturer direct, the manufacturer's authorised distributor, an approved independent distributor, or none other. Ask every bidder to name the legal seller, the ship-from location and the original manufacturer for each line.
ECIA's summary of SAE AS6496 describes authorised distribution as sales made under a manufacturer's distribution agreement, and it requires an authorised distributor to disclose in writing at quotation if it is not authorised for an item. Make that disclosure a column in your template. For high-risk lines, ask for lot and date codes, the certificate of conformance that will ship, storage history and packaging condition.
If you allow independent stock, require it to be labelled as such, never presented as factory-authorised. Specify the inspection and test plan, sample retention, reporting and warranty, and ask for the cost of those controls as a separate line.
Ask for technical and compliance evidence by line
Attach controlled specifications rather than web links that may change. Note where they apply:
- electrical and environmental ratings;
- datasheet revision and errata;
- reliability or qualification requirements;
- moisture-sensitivity level and storage limits;
- ESD classification and packaging;
- inspection, test and sampling plans;
- programming or firmware version;
- certificate contents and record retention;
- notice period for product or process changes.
On shelf life and date codes, point suppliers to the manufacturer's own policy rather than inventing an age limit. Texas Instruments, for instance, publishes how storage and packaging affect the shelf life of its products.
Avoid a single "RoHS: yes/no" column. Name the market, the regulation or customer specification and its revision, and the format you want the evidence in, and ask whether the declaration covers the exact part number from every production site quoted. Two standards help. IEC 62474:2018 sets the procedure, content and form of material declarations for the electrotechnical industry. The IPC-1752 materials-declaration standard is now at Revision C (June 2026, checked October 2026), and IPC says new revisions in the IPC-175x series will be supported by JSON schemas from 2026. Structured declarations can be reused; an unversioned email saying "compliant" cannot.
Add product-specific needs where relevant, such as BIS registration, wireless approval, battery transport documents or a customer's restricted-substance list. Component evidence supports your finished-product compliance; it does not establish it on its own.
Control alternates
Ask every supplier to quote the part you specified as the base case. Alternates go on separate rows, each with:
- the proposed manufacturer and exact MPN;
- why it is proposed;
- datasheet and lifecycle status;
- electrical, mechanical and environmental differences;
- footprint, pinout and firmware impact;
- compliance and qualification evidence;
- MOQ, lead time and price;
- sample availability.
Mark every proposed alternate as not approved until engineering has compared and qualified it. That keeps useful suggestions coming without turning a quotation into an unapproved design change. The cross-reference guide covers how engineering should assess them.
Make the commercial terms explicit
Ask for currency, price basis, taxes, freight, insurance, duties, payment terms, warranty, transfer of title and risk, cancellation, returns and liability for excess stock. For imports, give the full Incoterm with a named place and the edition, for example "FCA Chennai Airport, Incoterms 2020". ICC's eleven Incoterms rules define delivery responsibilities between seller and buyer; Incoterms 2020 remained the current edition when checked in October 2026. They do not cover payment, warranty or acceptance, so state those separately.
Ask bidders to itemise unit and extended prices, NRE and programming, test and document fees, reel or cut-tape charges, freight and insurance, expedite fees, and any holding or cancellation charges.
Force assumptions into the open
Include an exceptions table. Every deviation from the requested part, quantity, source, date code, delivery date, quality requirement, compliance or commercial term must be listed there. Say in the instructions that a blank means "not quoted", not "complies".
Answer bidders' questions in a numbered clarification log sent to every bidder. If an answer changes scope, issue a revised RFQ and say whether quotes must be resubmitted. Side conversations with one supplier produce bids that cannot be compared.
Show what a good line looks like
A vague line invites a vague answer: "10k resistor, 50,000 pcs". A usable one reads:
"Line 0042. Internal PN R-10K-1-0603. Approved MPN Yageo RC0603FR-0710KL: 10 kΩ, 1%, 0.1 W, 0603. Quantity per assembly 6. Pilot 3,000 assemblies; forecast 60,000 assemblies a quarter. Quote the exact MPN, source status, stock location, MOQ and standard pack, price breaks, lead time, date code, certificate of conformance and change-notice terms. List alternates on separate rows. No substitution without written approval."
Evaluate bids on more than the total
Check completeness and technical compliance before you look at price. Then build an evaluated cost for each bid:
evaluated cost = material + NRE and tooling + logistics + duties and fees + inspection and testing + expected excess stock + a risk allowance you can explain.
Compare line by line on MPN, source status, stock, MOQ and pack, lead time, date code, lifecycle, evidence and exceptions. Flag partial bids, and work out the extra cost of splitting an award. Record why the winner won, especially when it was not the cheapest, so the next buyer understands the decision. Landed cost for imports is covered in the landed cost guide.
Where forUdyog fits
If you are still finding suppliers to send the pack to, forUdyog's supplier categories and directories are a place to look, and you can post a QUICK RFQ on the RFQ page describing your requirement. Whatever responses arrive should go through the same template and checks as any other bid.
Sources
Each source was opened and checked on the date shown. Rules, rates and company details change, so confirm anything time-sensitive before you act on it.
- IPC Standards Related Resources (IPC-2570 Product Data eXchange)
- IEC 62474:2018 Material declaration for products of and for the electrotechnical industry
- Materials Declaration Data Exchange Standards Homepage (IPC-175x series)
- Incoterms rules
- SAE AS6496 Anti-Counterfeiting Standard (authorised distribution)
- Product shelf life
Continue on forUdyog
- Post a QUICK RFQ
- Industrial sourcing brief
- Components and electronics sourcing
- Component distributors
Have a specific requirement? Describe it on the QUICK RFQ page.
