When a component fails in the field, "what date code was on the reel?" is the wrong first question. The useful questions are which purchase brought that material in, which physical lot went into stores, where it was used, which finished units may contain it, and what evidence supports where it came from. If those answers take a week to assemble, containment means stopping every product that uses the part. If they take an hour, you can quarantine a few hundred serial numbers and keep shipping the rest.
The method is not complicated. Give every receipt one internal lot identity, keep the supplier's identifiers as separate fields, and record each event that changes where the material is, how much there is, who holds it, or what it has become part of. This guide explains what each identifier means, what a certificate of conformance (CoC) does and does not prove, and how to keep the chain intact through reel splits, assembly and rework.
What each code on the label tells you
Do not use one "batch number" field for everything. Record these separately:
- Manufacturer part number (MPN): the component definition you ordered.
- Date code: usually a manufacturing period. It does not identify a lot on its own.
- Lot code: a batch or group the manufacturer tracks together.
- Country of origin: where the part was made.
- Package or reel ID: one physical handling unit.
- Moisture barrier bag seal date: when the dry pack was sealed, which matters for moisture-sensitive parts. It is not the manufacture date.
- Your internal receipt-lot ID: the permanent link between the physical stock and all its records.
The ECIA's label specification, EIGP 114.2018, gives each of these its own barcode data identifier. Date codes use 9D or 10D in the format YYWW (last two digits of the year, then the week number from 01 to 53), with the supplier deciding what the date signifies, often the manufacture date. Lot code uses 1T, country of origin uses 4L with the two-letter ISO country code, and package IDs use 3S, 4S or 5S. Where a product is not tracked by a date or lot code, the specification asks for N/T (not traceable) rather than a blank. The ECIA also publishes yearly weekly date-code calendars under its EIA date-code programme.
Two practical consequences follow. Two different lots can carry the same date code, so a date code match is not a lot match. And one lot can arrive on several reels, so a lot code is not a package ID.
Mixed date codes and lots
EIGP 114 also sets a convention for cartons that hold one part number with several date or lot codes: the date-code field shows the oldest date code followed by "M", or the word MIXED, and the lot field shows MIXED or MULTI. On the packing slip, each lot should appear on its own line. When you see an M suffix or a MIXED entry at receiving, open the carton and record each lot separately before anything goes into stores.
Is an old date code a problem?
Often less than buyers assume, but it depends on the manufacturer and the part. Texas Instruments states that its manufacturing date code has no impact on usage, quality or reliability, and that the minimum useful life of its products runs from the date of delivery to the customer, not the date of manufacture. It ties shelf life instead to materials, moisture sensitivity level, dry packing and the customer's storage conditions. In 2025 the ECIA ran a webinar series asking whether blanket date-code restrictions are still relevant, with speakers arguing for reform; the same announcement notes that some OEMs and contract manufacturers remain concerned about soldering aged parts.
The sensible position is to set date-code limits part by part, based on the manufacturer's guidance, the part's moisture and solderability sensitivity, and your customer's requirements, rather than a blanket "under two years" rule that excludes genuine authorised stock. Whatever rule you use, write it into the PO. For how date-code limits fit into supplier quotes, see checking MOQ, lead time and date code.
For moisture-sensitive packages, the date code tells you little about readiness to solder. IPC/JEDEC J-STD-033 (revision D, April 2018, was the current listing when checked in October 2026) sets out dry packing and handling, and its dry pack is intended to give at least 12 months of shelf life from the bag seal date. TI notes that its bags carry a humidity indicator card, and that if the card shows pink at more than 10%, the parts need baking before use. Record bag opening, resealing, dry-cabinet time and bake events as part of the lot history.
What a certificate of conformance proves
A CoC is a supplier's signed statement that the goods conform to the order, supported by that supplier's own records. It is not a laboratory result, and it does not prove the parts are genuine.
The ECIA's guideline NIGP 115, written by its member authorised distributors, explains a point that surprises many buyers: most component manufacturers do not send a separate CoC with their shipments. Some print a conformance statement on the packing list; some rely on the packing list alone. The guideline's answer is an authorised distributor CoC printed on the packing list, carrying:
- customer name and address, and distributor name and address;
- your PO number and the shipment date;
- the manufacturer's name, the MPN and your own part number;
- quantity;
- date code and lot code, where the manufacturer provides them; and
- country of origin.
The statement confirms that the parts were bought from the manufacturer and kept within its authorised channel, that they carry the manufacturer's warranty, and that chain-of-ownership records are on file for review on request. It is signed, with the signatory's name and title.
So decide before the order what evidence you will accept. If quality expects a manufacturer CoC on every line and the authorised channel does not routinely provide one, you will find out at the dock. Ask for a distributor CoC to this content, plus the right to request chain-of-ownership records when needed.
Outside the authorised channel, a CoC means less. JEDEC's JESD243 makes the point in its definitions: supply-chain traceability is documented evidence of a part's history, and it does not imply authorised distribution or a manufacturer's warranty. A broker's CoC that cannot be tied to upstream documents only tells you what the broker is willing to sign. Whether the issuer is authorised is a separate check, covered in verifying an authorised distributor.
How long suppliers keep the records
Retention is part of what you are relying on. ECIA's December 2024 summary of the SAE AS6496A revision says record-keeping requirements for authorised distributors were extended from three years to ten. Distributors publish their own plans too; DigiKey's counterfeit control plan, for example, says it keeps records of supply-chain intermediaries so it can trace products back to the manufacturer, and obtains manufacturer CoCs where possible. Set your own retention by the longest applicable customer, contract, regulatory and product-life requirement, and write it down by record type.
Checking the CoC at receiving
Treat the CoC as a transaction record and check that it maps to the physical goods:
- seller and shipper match the approved source, or a logistics route you were told about;
- your company, PO number and line are correct;
- manufacturer and full MPN match the order and the package labels;
- quantities agree across CoC, packing list and packages;
- date codes, lot codes and country of origin agree with the labels;
- the conformance statement covers what the PO required; and
- the document is signed under the supplier's system, with no alterations or missing pages.
Any mismatch sends the receipt to quarantine. Quality, not stores, decides whether to release, release with conditions, return or inspect further. For open-market material, the receiving check is the start of the process, not the end; see counterfeit IC checks.
Create the receipt lot at the dock
Photograph or scan the original labels before any outer packaging is thrown away, and never replace a manufacturer label without keeping an image of it.
Give the delivery an internal ID, for example RCV-20261118-031, and apply it to every package and every record. If one delivery contains two manufacturer lots, create two receipt lots even if MPN and date code match. If one lot arrives on five reels, keep one lot identity and five package IDs. Record exceptions as structured fields (missing lot code, unreadable label, quantity variance, broken moisture barrier, unexpected date code, CoC mismatch) so they can be counted and reviewed, not buried in an email.
The minimum fields for the receipt-lot record are: internal ID and status; supplier legal name; manufacturer and MPN; your part number and revision; PO, PO line, packing list and invoice references; quantity received; date code, lot code and country of origin; original package IDs; CoC reference and check result; receiving date, location and inspector; moisture sensitivity level, seal date and dry-storage status; and the source channel with any deviation or test report.
Keep identity through splits and returns
A location record is not traceability unless it keeps the material's identity. Each move should update location, quantity, status, operator and time without overwriting what came before.
When a reel is split, give each child its own ID linked to the parent, so reel R01 under RCV-20261118-031 becomes R01-A and R01-B. Record the quantity before the split, each child quantity, the operator, the counter used and the new labels. The arithmetic must close: the parent quantity equals the child quantities plus anything issued plus any documented loss.
Do not merge partial reels because the MPN and date code look the same. If a reel's identity has been lost, quarantine it rather than guessing. Stock returned from the line keeps its child ID and gets a return event, an inspection status and, for moisture-sensitive parts, an updated exposure time.
Link component lots to what you build
At kitting, scan each package ID against the work order. At the line, check MPN and package ID against the feeder or station. Record quantity issued, used, returned and scrapped. The relationship you need is simple to state: this component package went into this work order and produced these PCBA serial numbers.
Where the line cannot log every placement, link each loaded reel to the range of serial numbers, or the time window, produced while it was on the machine, and record changeover points. If two lots fed the same work order, keep both links. Carry the chain from PCBA serial to box-build serial and on to the customer shipment, and make rework records add the removed and replacement component lots, the technician and the serial affected. If an EMS partner builds for you, ask to see how it does this before you place the order; our guide on selecting PCB assembly capability lists other questions to ask.
How deep to go is a risk decision. IPC-1782B, the IPC traceability standard (2023 edition), sets minimum traceability requirements according to risk; its general requirements begin with a risk assessment, choosing a traceability level and documenting it in the agreement between user and supplier. A low-cost resistor in a consumer accessory does not need the same depth as a controller in a medical or automotive product. Decide the level by product family before material is bought.
Prove it works with a trace drill
Pick one receipt lot and ask the team to produce, within a set time: the source, PO, packing list and CoC; the quantity received, released, used, scrapped and left; every current location and package ID; the work orders and serial numbers that used it; and the customer shipments that contain those units. Then run it backwards: pick a finished serial number and list every controlled component lot inside it.
Measure how long each direction took, and note every gap, every quantity that does not reconcile and every unit you could not rule in or out. Fix those, then repeat the drill with a different lot. A system that has never been tested usually fails on the day it is needed, so schedule the drill like any other audit.
Sources
Each source was opened and checked on the date shown. Rules, rates and company details change, so confirm anything time-sensitive before you act on it.
- EIGP 114.2018: ECIA Labeling Specification for Product and Shipment Identification in the Electronics Industry - 2D Barcode
- NIGP 115.00: Certificates of Conformance for Commercial Electronic Parts
- ECIA Quality resources, including the AS6496A five-year review update
- ECIA Launches Webinar Series: Are Date Code Restrictions Still Relevant
- EIA Weekly Date Codes
- Product shelf life
- J-STD-033D: Handling, Packing, Shipping, and Use of Moisture/Reflow Sensitive Surface-Mount Devices
- IPC-1782B: Standard for Manufacturing and Supply Chain Traceability of Electronic Products (table of contents)
- JESD243: Counterfeit Electronic Parts: Non-Proliferation for Manufacturers (2016 edition)
- Counterfeit Control Plan (POL-134)
Continue on forUdyog
- Quality and compliance
- PCB fabrication and assembly
- Selecting PCB assembly capability
- PCB and PCBA suppliers
Have a specific requirement? Describe it on the QUICK RFQ page.