Engineering, purchasing, quality and suppliers often use the same acronym for different things, and the gap only shows when a shipment arrives wrong. This glossary gives working definitions of the terms an electronics buyer in India meets every week. They are plain explanations, not legal text: where a standard, contract or company procedure defines a term, that definition wins, and it is worth naming it on the RFQ or purchase order.
The terms are grouped by where you will meet them, from the BOM through to Incoterms. A few pairs that are always used together, such as ECO and ECN, share one entry, so the list has 100 entries in all.
The BOM and engineering control
- BOM (bill of materials): the structured list of items, quantities and relationships needed to make a product.
- EBOM (engineering BOM): the BOM as designed; PTC describes it as a hierarchy of assemblies, subassemblies and components that engineering keeps updated as the design changes.
- MBOM (manufacturing BOM): the BOM as built, adding process materials, packaging and production-specific quantities to the design view.
- MPN (manufacturer part number): the complete orderable code the component maker assigns, including package, grade and packing suffixes.
- IPN (internal part number): your own item code, mapped to one or more approved MPNs so the design does not depend on a single maker.
- AML (approved manufacturer list): the manufacturers and exact MPNs engineering has approved for each internal item.
- AVL (approved vendor list): the sellers quality and procurement have approved to supply a given part or service; some companies use AVL for both lists, so define it.
- Reference designator: the label that identifies a part's position on a board, such as R12, C5 or U3.
- DNP or DNI (do not populate, do not install): a position on the board intentionally left empty in a given build or variant.
- Effectivity: the date, lot, build or serial number from which a change applies.
- ECO and ECN (engineering change order, engineering change notice): the documents that authorise and announce a controlled change; usage varies, so check which one your procedure requires.
- Deviation: permission granted in advance to depart from a requirement for a stated quantity or period.
- Waiver (or concession): acceptance, after the fact, of material that does not meet a requirement, limited to the stated lot or quantity.
- Form, fit and function: the three tests for interchangeability: physical shape, mechanical and electrical interface, and performance in use.
- Drop-in or pin-to-pin alternate: a part with the same footprint and pinout; it still needs electrical, firmware and qualification checks before approval.
Suppliers and sourcing documents
- OCM (original component manufacturer): the company that makes, or owns the brand of, the component.
- OEM (original equipment manufacturer): the company that sells the finished product under its own name.
- ODM (original design manufacturer): a supplier that designs and builds a product another company sells under its brand.
- EMS (electronics manufacturing services) provider: a company that assembles and tests boards and products to a customer's design.
- Box build: assembly beyond the board: enclosure, wiring, sub-assemblies, final test and packing.
- Turnkey, consigned and partial turnkey: whether the EMS provider buys all parts, the customer supplies them, or the two split the BOM.
- NPI (new product introduction): the process of taking a design from prototype through pilot builds to stable production.
- Authorised (franchised) distributor: a distributor appointed by the manufacturer to sell its products, giving a direct trail back to the maker.
- Line card: the list of manufacturers a distributor represents.
- Independent distributor: a non-franchised seller that buys stock in the open market or from excess inventory.
- Broker: an intermediary who arranges supply and may never hold the stock physically.
- RFI (request for information): an early enquiry to learn what suppliers can do before asking for prices.
- RFQ (request for quotation): a structured request for price, lead time and commercial terms against a defined requirement.
- NDA (non-disclosure agreement): the contract that governs how shared confidential information may be used.
- Supplier qualification: evidence-based approval of a supplier for a defined site, process and scope.
Quantity, price and commitment
- MOQ (minimum order quantity): the smallest quantity a supplier will accept for a line.
- SPQ (standard pack quantity): the quantity in the maker's standard pack, such as a full reel; it may differ from the MOQ.
- Price break: the unit price that applies to a stated quantity band.
- NRE (non-recurring engineering): one-time charges for engineering, programming, fixtures or setup.
- NCNR (non-cancellable, non-returnable): a line that cannot be cancelled or sent back once ordered; DigiKey, for instance, applies it to parts so marked at quote and may apply it to parts bought from a maker for a specific customer.
- PPV (purchase price variance): the difference between the price paid and a defined baseline or standard cost.
- TCO (total cost of ownership): purchase price plus logistics, quality, inventory, support and end-of-life costs.
- Landed cost: the cost of a part delivered to your door, including freight, insurance, duties and clearance charges.
- Spot buy: a single purchase at the day's price and availability.
- Blanket PO: an order setting prices and terms for repeated releases over a period; whether it commits any quantity depends on its wording.
- Scheduling agreement: an outline agreement that spreads a planned quantity over dated delivery releases.
- Release (call-off): an instruction to deliver a stated quantity on a stated date under a wider agreement.
- Consignment stock: supplier-owned inventory held at the buyer's site and paid for when used.
- VMI (vendor-managed inventory): an arrangement where the supplier replenishes the buyer's stock within agreed limits.
- Allocation: a supplier rationing scarce output among customers.
Planning, inventory and delivery
- Lead time: the time between two defined events, such as order and shipment; always state which events.
- Factory lead time: the manufacturer's time to produce a part from a new order, as distinct from distributor stock.
- Acknowledged date: the delivery or ship date the supplier confirms against your purchase order.
- Decommit: a supplier withdrawing or moving an earlier confirmed date or quantity.
- Forecast: a time-phased estimate of future demand, not a purchase commitment unless a contract says so.
- Firm (frozen) horizon: the near-term window in which quantities and dates cannot change without liability.
- Safety stock: inventory held to absorb defined variation in demand or supply.
- Excess and obsolete (E&O) inventory: stock above validated need, or stock no longer expected to be used.
- OTD (on-time delivery): the share of deliveries arriving within the agreed window.
- OTIF (on time in full): the share of deliveries that are both on time and complete.
Lifecycle and change
- Active: in production and recommended for new designs.
- NRND (not recommended for new designs): still available for existing designs, but the maker advises choosing an alternate for new ones.
- EOL (end of life): the stage where the maker is ending production or support.
- PDN (product discontinuance notice): the formal notice that a part will be discontinued, usually with last order and ship dates.
- LTB (last time buy): the final window to order before discontinuation.
- Obsolete: no longer manufactured.
- PCN (product change notification): a maker's notice of a change to a part's design, materials, process or site.
- Obsolescence management: a planned process to find and act on coming loss of availability across a product's life.
- Second source: an additional approved source that reduces dependence on one supplier or maker.
- Cross-reference: a suggested equivalent from a tool or distributor; a lead for engineering, never an approval.
Quality and traceability
- CoC (certificate of conformance): a supplier's signed statement that delivered goods meet the order requirements; useful evidence, but not proof of authenticity on its own.
- Chain of custody: the recorded handovers of material between parties; ISO 22095:2020 sets out terminology and models for it.
- Traceability: the ability to follow a part's history, use or location through records.
- Lot code: the identifier linking parts to one production lot.
- Date code: a marking showing when a part was made, in the maker's own format, often year and week.
- Incoming inspection (IQC): checks on purchased material when it arrives.
- AQL (acceptance quality limit): in ISO 2859-1 sampling, the worst process average quality that is tolerable when a continuing series of lots is inspected.
- FAI (first article inspection): full verification that the first item from a new process or supplier meets every requirement.
- PPAP (production part approval process): the automotive industry's evidence package showing a supplier's process can make the part consistently.
- NCR (nonconformance report): the record of an item or process failing a requirement.
- SCAR (supplier corrective action request): a demand that a supplier contain a problem, find its cause and prevent recurrence.
- 8D (eight disciplines): a structured team method for problem solving and corrective action.
- DPPM (defective parts per million): defective units per million supplied, under an agreed counting rule.
- Counterfeit part: a part misrepresented as genuine, new, a higher grade or from another source than it really is.
Packaging and line readiness
- MSL (moisture sensitivity level): the class, set under JEDEC and IPC J-STD-020, that says how long a surface-mount part may be exposed to air before reflow; levels run from 1 (least sensitive) to 6.
- Floor life: the time a moisture-sensitive part may spend out of its dry pack, at the factory conditions the handling standard specifies, before it must be reflowed or baked.
- Dry pack: a sealed moisture-barrier bag with desiccant and a humidity indicator card.
- Tape and reel: parts held in pockets on carrier tape wound on a reel, ready for pick-and-place feeders.
- Cut tape: a length cut from a reel; cheaper to buy in small amounts but harder to feed and trace.
- Tray and tube: rigid carriers for larger packages and through-hole parts.
- ESD (electrostatic discharge): a static discharge that can damage sensitive parts; handling areas need ESD controls.
- Shelf life: the storage period, under stated conditions, after which parts need review, testing or disposal.
India-specific terms
- Local content: under DPIIT's public procurement order, value added in India as a percentage of the item's value, excluding imported items bought from local resellers.
- Class-I and Class-II local supplier: bidders with at least 50% and at least 20% local content respectively, unless the nodal ministry sets higher thresholds (checked October 2026).
- HSN code: the Harmonised System code used in India to classify goods for customs tariff and GST.
- BCD (basic customs duty): the main duty charged on imports under the customs tariff.
- BIS CRS (Compulsory Registration Scheme): the Bureau of Indian Standards' Scheme-II, under which notified electronics and IT products need registration before sale in India.
- GSTIN: the 15-character GST identification number of a registered business.
Incoterms
- Incoterms rules: the International Chamber of Commerce's set of eleven three-letter trade terms that allocate delivery tasks, costs and risk between seller and buyer; name the version (Incoterms 2020) and the place.
- EXW (Ex Works): the seller makes the goods available at its own premises; the buyer handles everything after that.
- FCA (Free Carrier): the seller hands export-cleared goods to the carrier the buyer nominates, at the named place.
- FOB (Free On Board): the seller loads the goods on the vessel at the named port; meant for sea and inland waterway transport.
- CIP (Carriage and Insurance Paid To): the seller pays carriage and insurance to the named destination, but risk passes when the goods are handed to the first carrier.
- DAP (Delivered at Place): the seller delivers to the named place, ready for unloading; the buyer clears import and pays duties.
- DDP (Delivered Duty Paid): the seller delivers to the named place and also clears import and pays the duties.
Pairs that cause most mistakes
Five confusions account for a large share of avoidable errors. AML and AVL answer different questions, what part and who may sell it, so keep them as separate approvals. MOQ and SPQ often match but need not, and the gap decides how much excess you buy. "Lead time" on a quote is meaningless until you know whether it is distributor stock, factory lead time or an acknowledged date. A CoC tells you what the supplier asserts, not what the part is. And an Incoterm settles delivery, cost and risk, but not payment, title or warranty, which need their own contract terms.
To see these terms in use, read the guides on preparing an electronics RFQ, date codes, lot traceability and CoCs and Incoterms for electronics imports.
Sources
Each source was opened and checked on the date shown. Rules, rates and company details change, so confirm anything time-sensitive before you act on it.
- What is an Engineering Bill of Materials (eBOM)?
- Product life cycle
- J-STD-020F: Moisture/Reflow Sensitivity Classification for Non-hermetic Surface Mount Devices
- ISO 2859-1: Sampling procedures for inspection by attributes, Part 1: Sampling schemes indexed by acceptance quality limit (AQL)
- ISO 22095:2020 Chain of custody: General terminology and models
- Incoterms rules
- Public Procurement (Preference to Make in India), Order 2017: revised order dated 19 July 2024
- Scheme-II: Compulsory Registration Scheme
- Terms and Conditions (non-cancellable/non-returnable products)
Continue on forUdyog
- Electronics suppliers
- Component distributors
- Understanding manufacturing certifications
- Industrial sourcing brief
Have a specific requirement? Describe it on the QUICK RFQ page.